ERMs Role
- ERM supported a major power sector client in securing a life extension for the six-turbine Great Orton Wind Farm near Wigton, Carlisle. Originally commissioned in 1992, Great Orton was one of the UK's earliest commercial onshore wind farms.
- ERM led the Section 73 application process, managing engagement with the local planning authority, Natural England and other statutory consultees throughout the project.
- To support the application, ERM undertook comprehensive environmental appraisals and ecological surveys to reassess baseline conditions and biodiversity sensitivities. This included survey design, data analysis, technical reporting and Biodiversity Net Gain (BNG) advice.
- Proactive stakeholder engagement helped clarify planning requirements, align expectations at an early stage and secure timely input from key consultees, reducing consenting risk and supporting a smooth determination process.
Key Challenges
Since the Development became operational over 30 years ago, the baseline environment and relevant policy context had changed considerably in that time. Statutory guidance and planning policy had evolved, particularly in relation to the protection of biodiversity and the assessment of ecological effects associated with onshore wind development.
At the time of the original development, the site comprised a disused Royal Air Force airfield and surrounding arable land. Subsequently, part of the site was used for the disposal of livestock during the 2001 Foot and Mouth Disease outbreak, before being transformed into the Watchtree Nature Reserve in 2003, which now forms part of the wind farm site.
As habitats and species assemblages had changed since the wind farm commenced operation, and understanding of the potential effects of wind turbines on birds and bats had advanced significantly, there was a need to assess whether continued operation of the Development could adversely affect biodiversity interests.
To support the assessment, ERM undertook a comprehensive programme of ecological appraisal and survey work, including bat activity surveys, bat carcass searches, and a year-long avian flight activity survey.
ERM also completed data analysis, reporting and assessment, provided Biodiversity Net Gain (BNG) advice, and undertook proactive stakeholder engagement to clarify planning requirements and secure early input from key consultees.
Outcome for Client
The assessment concluded that continued operation of the wind farm would not result in any increased risk to biodiversity and that no mitigation measures were required. Consultation with Natural England also confirmed that statutory BNG requirements did not apply to the proposed life extension.
The Section 73 application was submitted in the third quarter of 2024 and was subsequently approved, securing a 15-year extension to the operational life of the wind farm.