In 2017, ERM was appointed by ScottishPower Renewables as lead environmental consultant to undertake the Environmental Impact Assessment (EIA) for the repowering of Corkey Wind Farm, an operational onshore wind farm located in County Antrim, Northern Ireland, approximately 5 km south-west of Ballymoney. The project was one of the UK's earliest large-scale onshore wind farm repowering projects and sought to replace ten ageing turbines with five larger, higher-capacity turbines.
ERM led the EIA process, delivered the Environmental Statement (ES), and managed all associated environmental workstreams. This included coordinating the project from scoping through to application submission, managing consultation with statutory consultees and key stakeholders, and delivering the majority of specialist environmental and engineering assessments in-house.
The design approach was tailored to maximise the reuse of existing infrastructure, including tracks and crane hardstandings, thereby reducing environmental impacts and minimising construction requirements. ERM provided environmental advice, civil design input, survey management, EIA coordination and planning support throughout the development process.
Following submission of the planning application, ERM continued to support ScottishPower Renewables, working alongside a local planning consultancy to respond to consultation feedback and technical queries. This resulted in the preparation of three Supplementary Environmental Information (SEI) submissions, each addressing specific environmental and planning matters raised during determination. ERM also provided support at the planning committee stage.
Value Delivered
- Successfully led one of the UK's first major wind farm repowering EIAs, helping to establish a consenting pathway for future repowering projects.
- Provided a fully integrated service combining environmental consultancy, engineering design, planning support and stakeholder management within a single project team.
- Developed a bespoke design solution that maximised the reuse of existing infrastructure, reducing environmental effects and supporting a sustainable repowering strategy.
- Utilised ERM's in-house technical specialists to address complex environmental and planning issues throughout the consent process.
- Managed stakeholder engagement and responses to extensive consultation feedback, including preparation of three SEI submissions during determination.
Outcome
Planning permission for the Corkey Wind Farm Repowering project was granted by Causeway Coast and Glens Borough Council on 2 March 2022. The consented scheme reduced turbine numbers from ten to five while increasing installed capacity from approximately 5 MW to 25 MW, delivering substantially greater renewable energy generation from the existing wind farm site.
Key Services: EIA Coordination, Environmental Statement Preparation, Planning Support, Environmental Management, Civil Design Support, Stakeholder Consultation, Environmental Surveys and Survey Coordination, Supplementary Environmental Information, Consenting Strategy and Planning Committee Support.