Search

Saldanha Bay

Floating Power Plant

The Draft Scoping Report for the above mentioned Project was released for a 30 day comment period in November 2015, as part of Pre-Application Stakeholder Engagement.  The Application has been submitted to the Department of Environmental Affairs (DEA) and a reference number assigned (14/12/16/3/3/2/885).  In order to meet the administrative requirements of the DEA and the NEMA: EIA Regulations, the Draft Scoping Report will be re-released for public review and comment. The comment period will be open from 10 February to 11 March 2016.  

Download Map (800Kb PDF)

Background Information Document for the Floating Power Plant EIA in Saldanha Bay (1.4Mb PDF)

Draft Scoping Report for Floating Power Plant

Draft Scoping Report(6811 KB)

Annexure(4951 KB) 

Comment and Responses for Initial Notification Phase.pdf (115.1Kb PDF)

Comment and Responses Report for the Draft Scoping Phase.pdf ( 228.9Kb PDF)

 

 

 

Contact Information

Tougheeda Aspeling 
Tel: 021 681 5400; 
Fax to email: 086 719 5869
Postnet Suite 90, Private Bag X12, Tokai, 7966
Email: G2Psaldanhabay.eia@erm.com