ERM

Environmental Impact Assessment

for the Phase 1 Development of the Jubilee Field

Tullow

Jubilee Field Phase 1 Development Project

Tullow Ghana Limited (Tullow) and its joint venture partners Kosmos Ghana HC (Kosmos), Anadarko WCTP Company, Sabre Oil and Gas, the EO Group, and the Ghana National Petroleum Corporation (GNPC), known as the Jubilee Joint Venture, are proposing to develop hydrocarbon resources within the Jubilee Field, an oil and gas reserve located offshore Ghana.  The field is located approximately 60 km from the nearest coast and lies in deep water (1,100 to 1,700m), straddling two oil concession blocks (Figure 1).  

Under the Ghana Environmental Assessment Regulations LI 1652 1999, Tullow and partners are required to submit an Environmental Impact Statement (EIS) describing the project and providing an assessment of the potential impacts from the proposals and the proposed measures to be taken to manage these impacts.

The Final EIS is available here to be downloaded in a series of PDF documents.

Figure 1: Location of the Jubilee Field

(Click here for larger image)

Development of the Jubilee Field will be undertaken in phases with potential future phases depending on the success of Phase 1.  Phase 1 would consist of subsea oil and gas production wells connected to a Floating Production Storage and Offloading vessel (FPSO) permanently moored in the Jubilee Field.  The processed crude oil would be stored in the FPSO storage tanks and offloaded to oil tanker vessels for delivery to international markets approximately every 7 to10 days. 

Well completions and installation of subsea equipment and FPSO is planned for late 2009 through to mid 2010 and initial oil production is targeted for late 2010.  Field operations are projected to last for 20 years (ie until 2031) although future appraisal and development of the reserve may extend this period significantly.

EIA Team

Tullow commissioned Environmental Resources Management (ERM) in collaboration with ESL Consulting, Ghana (ESL) to undertake the EIA for the Phase 1 Jubilee Field development.

File Downloads

Environmental Impact Statement

Covers and Contents (PDF 239KB)
Non Technical Executive Summary(PDF 2.16MB)
Chapter 1 Introduction (PDF 455KB)
Chapter 2 Legal and Policy Framework (PDF 235KB) 
Chapter 3 Project Description (PDF 1.75MB)
Chapter 4 Environmental Baseline Description Part 1 (PDF 3MB), Part 2 (PDF 1.38MB), Part 3 (PDF 1.58MB)
Chapter 5 Impact Identification and Assessment Part 1 (PDF 1.02MB), Part 2 (PDF 3MB)
Chapter 6 Mitigation Measures (PDF 251KB)
Chapter 7 Monitoring Plan (PDF 111KB)
Chapter 8 Decommissioning Plan (PDF 71KB)
Chapter 9 Provisional Environmental Management Plan (PDF 229KB)
Chapter 10 Summary and Conclusions (PDF 140KB)
References (PDF 107KB) 
Annex A Consultation Report Part 1 (PDF 1.76MB), Part 2 (PDF 3.94MB), Part 3 (PDF 3MB)
Annex B Drilling Report (PDF 870KB)
Annex C Modelling Report (PDF 796KB)
Annex D Safety Case QRA Results Part 1 (PDF 1.42MB), Part 2 (PDF 2.65MB), Part 3 (PDF 1.83MB)
Annex E Emissions Inventory (PDF 73KB)
Annex F Waste Management (PDF 412KB)

Environmental Baseline Survey Report:
Part 1 (PDF 2.62MB) Part 2 (PDF 3.14MB) Part 3a (PDF 3.07MB) Part 3b (PDF 1.00MB)

Health and Safety Procedures
Chemical Handling & Storage (PDF 438KB)
Handling of Hazardous Substances (PDF 105KB)
Heavy Lift from Supply Boat Using Crane Master (PDF 50KB)
Incident Investigation and reporting (PDF 1.10MB)
Lifting Operations (PDF 1.06MB)
Personal Protective Equipment (PDF 251KB)
Transfer Barite Bentonite and Cement from boat to rig (PDF 50KB)
Working at Heights Procedure (PDF 273KB)
Working overside in moonpool (PDF 37KB)

Project Information Posters
Project Information Posters (PDF 555KB)

 

For more information please contact:

Tullow Ghana Limited

Jamie White
E: jamie.white@tullowoil.com

Environmental Resources Management

Albert de Jong
T: + 27 (0)21 702 9100 or +27 (0) 83 451 4170
E: albert.dejong@erm.com